Why does my Python solution time out when N is 2000 and U is 100000?
I'm confused about why this solution exceeds the two-second limit. The grid size is at most N = 2000, and there can be up to U = 100000…
I'm confused about why this solution exceeds the two-second limit. The grid size is at most N = 2000, and there can be up to U = 100000…
I'm confused about why this solution exceeds the two-second limit. The grid size N is at most 2000, and there can be up to 100,000 updates. I estimated…
I'm solving a scheduling problem where each cow is milked from sᵢ to tᵢ and needs bᵢ buckets. Whenever a cow starts, it receives the smallest-numbered buckets that…