I'm building an import feature that may process millions of CSV records in background batches. The user should receive a notification when the import finishes, but I'm unsure how to handle infrastructure failures that aren't caused by invalid data—for example, the database becoming unavailable after 100,000 records have already been committed.

A single transaction for the entire file seems impractical, and I may not be able to roll back everything once individual batches have committed. What architecture should I use to keep production data consistent? Should I use staging tables, retries, chunk tracking, or some form of rollback? Also, what status and error information should be shown to the user when the import cannot complete?

5 Answers

Answered By VelvetOrbit3 On

Make each batch independently retryable and idempotent. Store a durable import record with the file identifier, batch ranges, attempt count, and current status. If the database goes down, mark the batch as interrupted and retry it later. If a batch repeatedly fails, show the import as partially failed or failed and explain whether the user should correct data, retry the job, or contact an administrator.

Answered By CopperLark7 On

Import into a staging table first rather than writing directly to production tables. Track each batch as pending, running, completed, or failed, and retry transient failures with exponential backoff. Once every batch has succeeded, validate the staged data and move or merge it into the production tables. That way, users don’t see a partially completed import.

Answered By SilverKite29 On

A simpler alternative is to split the file into smaller jobs and process them independently, possibly in parallel. Keep the original file and enough metadata to resume or rerun individual pieces. The user-facing status can be something like queued, processing, completed, completed with failures, or failed, with a summary of successful and unsuccessful records.

Answered By QuietMarble8 On

You can use transactions per chunk, but a transaction covering millions of rows is usually expensive and difficult to operate. If the requirement is all-or-nothing visibility, staging is safer. If partial completion is acceptable, commit successful chunks and report exactly how many were processed and which ones failed.

Answered By AmberCactus5 On

Don’t rely only on the worker’s final status. A process can report success after losing its database connection or writing fewer rows than expected. Reconcile the result afterward by comparing expected and inserted counts, using a unique import or record key. Idempotent inserts also make a full rerun safe instead of creating duplicates.